Climate, zone by zone.

Fan coils, split units and underfloor heating on the same bus as the lighting, with a thermostat per zone and setbacks that stop the house cooling rooms nobody is in.

Hardware
Keys Pro · anodised aluminiumOur own hardware
We integrate this

Best device on the market, specified and commissioned by us. We answer for compatibility, not for the badge on it.

What the system runs

What each zone gets.

A zone per room where it matters

Bedrooms and majlis separately; corridors and stores grouped.

Setbacks, not guesswork

Away and night profiles per zone, tuned again at the first-year visit once the house has been lived in.

Humidity where it counts

Readings in bathrooms and plant rooms, with alarms in the app.

One schedule with the lights

A scene can move both, so “away” means cooling back and circuits off in one action.

What we do not do

We do not supply or move mechanical plant. We control what your HVAC contractor installs, and we need their valve and fan-coil schedule before we can commit to a zone count.

Kinds of climate control

Four systems, one thermostat per zone.

A villa usually runs more than one kind of plant, and they are controlled differently. Which ones you have decides the zone count and the interface, so it is worth naming them early.

Fan coils and chilled water

Usual in larger new builds on chilled water. A valve and a fan speed per zone, which is what lets a guest room be held at a setback instead of being conditioned for nobody.

Split and VRF units

Controlled over the manufacturer's own bus rather than a dry contact, so the app shows the real setpoint and mode instead of guessing at them.

Underfloor and radiant

Slow to respond, so it is scheduled rather than switched — a setback that starts at the right hour matters more here than anywhere else in the house.

Fresh air and humidity

Ventilation rate and humidity read per zone. In this climate the complaint is almost never temperature; it is a room at 24 degrees and 70% relative humidity.

Settled before first fix

Five things your HVAC contractor decides with us.

Each of these is a coordination item, not a preference. Left to the end, they become a variation order.

01

The valve schedule sets the zone count

One motorised valve equals one zone. If the mechanical drawing has four valves, the house has four zones, whatever the lighting plan implies — we need that schedule before we can quote a zone count honestly.

02

Thermostat position decides comfort

A sensor on a wall in direct afternoon sun reads five degrees high and the room is cooled to compensate. Position is agreed on site, not on the drawing.

03

Setback depth is a comfort decision

Three degrees back is invisible and saves little; six is a real saving and takes forty minutes to recover. We set it per zone with you rather than applying one number to the house.

04

Humidity needs its own answer

Cooling dehumidifies as a side effect, so a well-zoned house that runs less can end up damper. Rooms that need it get humidity read and a dedicated strategy.

05

Mixed plant needs one interface decision

Fan coils on Modbus and splits on a proprietary bus can both work, but each interface is a physical device in a board. Deciding late means finding board space late.

Reference

The numbers for this function.

What we commit to in writing, so it can be checked against a drawing rather than taken on trust.

Zones
Per room, both floors
Interfaces
Modbus, 0–10 V, dry contact
Sensors
Wall thermostat, ceiling, duct
Setback profiles
Away, night, per zone
What it does

All functions

Start here

Send us the ceiling plan.

Forty minutes, free, no obligation. You will get the fitting count we would use, where the light falls short, and a straight answer about whether you need us at all.

  1. 01You send the planA PDF, a photo of the drawing, or nothing at all — we can start from a room count.
  2. 02We read it and call onceForty minutes. You get the count of fittings, the count of keys and where the board goes.
  3. 03You keep the drawingYours whether you buy from us or not. That is what makes it worth your hour.
Three lines and a drawingThe drawing is optional — the three lines are not.
Drag the plan here, or choose a filePDF, JPG or a photo of the sheet. Up to 20 MB.

One engineer answers, usually inside a working day. No call centre, no drip campaign.